Buku yang berada dalam website adalah buku buku yang tidak boleh diperjual belikan atau digandakan. Buku ini boleh anda download hanya dengan tujuan untuk belajar atau training untuk diri anda sendiri.
Books that are in the website are books that should not be sold or duplicated. This book may be downloaded only for the purpose of study or training for your own

Pages

15 Oktober 2013

Coiled Tubing Handbook

  • Title : Coiled Tubing Handbook by Halliburton Energy Institute
  • Publish : Halliburton Company, All rights reserved. Printed in the United States of America
  • Type Document : pdf 
  • Release : April 2004
  • Total Page : 13 Chapter
  • Size : 14.30 Mb

Download Free by Netload : [ http://adf.ly/XRiWi ]


Decrypted Contents

Coiled Tubing Units Overview
Halliburton Coiled Tubing Units (CTU’s) are named according to the pulling load rating (in klbs) of the Injector head. These are made in a range of different sizes to suit different applications.
Standard Units versus DNV Certified Units
Most new units are available as a standard option or as a DNV (Det Norske Veritas) certified package for operating in Hazardous environments such as offshore in the  North Sea. The main requirements for a DNV certified unit is it’s ability to work in hazardous environments with flammable gasses present and specially certified lifting equipment. This means all electrical components are sealed to prevent possible ignition sources and major modifications are required to the diesel power pack to prevent ignition sources from sparks etc.
15K CTU
This unit is a self contained single unit design with the advantage of a very fast rigup and rig-down giving it the ability to perform multiple jobs in a single day. This unit is mostly suited to shallow work with the smaller coiled tubing sizes. The 15K injector is designed and built by Halliburton and is mounted on a Hydra Rig designed truck unit.

Download Free by Netload : [ http://adf.ly/XRiWi ]

About Me

JOINT WITH US FOR SMART FUTURE